Your boarding house in Tangub, planned step by step.

Salamat, Sir Ronald, for meeting us on site. Here is what we discussed, how JMG works, what the ₱20,000 acceptance fee covers, and how you can watch your building grow, even from Canada.

Lot 9 (portion) · 242 sq.mBrgy. Labuyo, Tangub City2 storeys + 3rd-floor provision
GROUND SECOND THIRD · PROVISION SCHEMATIC ELEVATION · NOT TO SCALE
Your team

The people behind your building.

One team for design and construction. You will always know who to call, and who answers for the result.

Engr. Jasper M. Gementiza
Managing Owner · Civil Engineer

Engr. Jasper M. Gementiza

Your main point of contact. Leads every meeting, signs off every plan, and answers for the outcome.

Ar. Evan Burgos
Architect

Ar. Evan Burgos

Shapes the layout: rooms, stairs, light and airflow, so a narrow lot still feels open and well planned.

Engr. Kirby Aldrich Luy
Structural Engineer

Engr. Kirby Aldrich Luy

Makes it strong: the foundation, the creek-side footing, and the structure ready for your third floor.

Your lot and your idea

A narrow lot, used to the last square metre.

OLD SPANISH ROAD 6.26 m 24.60 m · creek side 13.25 m 25.95 m · road 242 sq.m
From the geodetic sketch plan PSC-10-003117. Not to scale.
  • Two storeys now, third floor later. We build the foundation and columns strong enough for a third floor, so you can add it when you are ready without tearing anything out.
  • Firewalls on the shared sides. Solid walls where you touch a neighbor. More privacy, more fire safety, and every metre inside the lot is usable.
  • Common toilets and showers, outside the rooms. Two toilets and two showers on each floor, placed so rooms stay compact and plumbing stays simple.
  • Built for students. Many homes along the road already post “boarding house, please inquire.” That tells us the school is bringing in steady demand.
Floor by floor

What goes where.

This is our starting layout. Room count and sizes are set together with you in the concept design.

Ground floor

Rooms, common area, shared CR

  • Stairs kept near the entrance
  • Water heater and laundry area planned in
  • Shop space can be added here if you decide
Second floor

Same idea, more rooms

  • Bathrooms stacked above the ground-floor ones. Shorter pipes, fewer leaks.
  • Cross-ventilation in every room
Third floor · provision

Ready when you are

  • Structure sized for it from day one
  • Stair space reserved
  • You decide later. Nothing is wasted if you never build it.
The creek beside your lot

We plan for the water first.

A creek is not a problem when it is planned for. It becomes a problem when nobody looks at it.

In simple wordsWater always looks for the lowest path. So we make sure it has a clear path that is not under your building.

Check the distance

Creeks usually need an open strip beside them. In urban areas this is commonly 3 metres under the Water Code. We confirm the exact figure with Tangub City before we draw.

Go deeper where needed

The footing depth on the creek side is set by our structural engineer after checking the soil, so the wall does not shift when the water rises.

Send water away

Roof and floor drainage is planned to flow to the road or creek outlet, with proper slopes and clean-outs. The building stays dry.

How we work

Seven steps. You always know what comes next.

In simple wordsBuilding a house is like cooking a big meal. First the recipe, then the shopping list, then the cooking. We never start cooking before the recipe is right.
  1. We meet and see your lot Done

    We walked the land in Tangub, met you and your brother, and shared our first ideas. This is where the trust starts.

  2. Acceptance fee ₱20,000

    This is the start button. It tells us you are ready and assigns your architect, engineer and estimator. It is deducted from your contract later. Pay the fee

  3. Concept design Target 2–3 weeks

    The first drawing of your building: rooms, stairs, bathrooms, where people walk. You tell us “yes” or “change this.” We adjust until it feels right.

  4. Final working drawings and BOQ Target 3–4 weeks

    The complete instruction book for the builders: exact sizes, steel bars, pipes, wires. Plus the BOQ, a shopping list with prices, so there are no surprise costs later.

  5. Contract signing ₱20,000 deducted

    You see the full price, the schedule and what is included, in writing. Your acceptance fee comes off the contract price. A 30% mobilization advance starts the work.

  6. Construction Est. 7–10 months

    Our foreman and engineers build. You watch from your phone. Billing is monthly and only for work we have checked and finished.

  7. Turnover Walkthrough

    We walk the building together with a checklist. We fix every item. The final 10% is released only after that list is clear.

Acceptance fee

₱20,000 to start. Credited to your contract.

It is not an extra cost. It is the first part of your building price, paid early so the right team is set aside for you.

One-time₱20,000100% deducted from your contract price
km

Your site is far from our office.Tangub is a long drive from Cagayan de Oro. Measuring, soil checks and site visits take a full team day each time, with travel, crew and coordination.

team

Your team is reserved.Our designers and engineers are finishing other out-of-town projects. The fee holds a place on the calendar for yours.

lot

We do the homework before we draw.We check your lot against the sketch plan, the creek strip and the setbacks, so the design is buildable from the first line.

2×

Serious on both sides.You are committed. We are committed. That is how a project starts clean.

What it startsConcept design, then final working drawings and BOQ.
What it becomesA credit on your contract. You do not pay for design twice.
Fair to knowOnce design work begins, the fee covers work already delivered, so it is not refundable.
Pay ₱20,000→Concept design→Working drawings→Contract price − ₱20,000
Pay the acceptance fee

Ready to start? Scan and pay.

  1. Open your banking app or GCash and choose Scan QR. On a phone, press and hold a QR image to save it, then upload it in your app.
  2. Check that the amount shows ₱20,000.00 and the account name starts with JMG CONST (BPI) or JA***R G. (GCash).
  3. Send the receipt to Engr. Jasper. We confirm right away and assign your team.
BPI InstaPay QR code for JMG CONST, PHP 20,000.00
BPI · InstaPay₱20,000.00
GCash InstaPay QR code, PHP 20,000.00
GCash · InstaPay₱20,000.00

Transfer fees may apply. Prefer a bank transfer or manager’s check? Message Engr. Jasper and we will send the details.

Schedule

A clear timeline before you commit.

Concept design
2–3 weeks
Final drawings + BOQ
3–4 weeks
Contract + mobilization
1–2 weeks
Construction
7–10 months
Turnover + punch list
1–2 weeks

Bar lengths are illustrative. Design targets are planning figures. The construction estimate is for a new two-storey building of this scale and is confirmed in your contract after the final drawings.

Monitoring

Watch your building from anywhere.

You should never have to wonder what is happening on your lot.

● REC · SITE CAMERA

Site CCTV

A camera on site so you can look at progress any time, in Canada or in Tangub.

Every week

Photo and video report

Short update of what was finished, what is next and anything that needs your decision.

Shared tracker

Dates and tasks online

You see the schedule, the milestones and what has been completed. No guessing.

Checkpoints

We inspect before we cover

Steel bars, plumbing and wiring are checked and photographed before concrete or walls close them up.

Billing

Pay for verified work

Monthly billings follow completed and checked progress, never a guess.

Virtual meetings

Time-zone friendly

Regular calls at times that work for you, with the engineer who is actually on your project.

What we take off your shoulders

We are not the cheapest. We are the least stressful.

Our clients hire us because they want it done properly the first time, with fewer mistakes and better coordination.

Guessing the priceA full BOQ first
Wondering what is happeningWeekly reports and a site camera
Coordinating many peopleOne team for design and build
Surprise changesChanges written and approved first
Rework and delaysPlanning done before digging
Paying before it is builtBilling tied to checked progress
₱20,000Acceptance fee, credited to the contract
30%Mobilization advance at signing
MonthlyProgress billing on verified work
10%Retention, released after the final walkthrough
Next step

Let us schedule our virtual meeting.

About 30 to 45 minutes with Engr. Jasper and the team. You leave knowing exactly what happens next.

  • Go through your Deed of Sale, title and sketch plan.
  • Decide the target number of rooms and the kind of tenants.
  • Talk about your budget range and the schedule.
  • Confirm the acceptance fee and the start date for concept design.

Please have ready: Deed of Sale, copy of title, tax declaration, a valid ID.

Pick your time Choose a time on the calendar

Opens Engr. Jasper’s booking calendar. Pick any open slot and it is confirmed straight away.

Or send a message

Hi Engr. Jasper, I am ready to proceed with the Tangub boarding house. Let’s schedule the virtual meeting on ______ at ______ (PH time). – Ronald

Engr. Jasper M. Gementiza WhatsApp / Viber: +63 917 105 6435 engr@jaspergementiza.com Message on Messenger
ProjectMonte Boarding House
SiteLot 9 (portion), Labuyo, Tangub City
Lot area242 sq.m