The Revelo-Garcia Residence — JMG Design & Build

JMG Design & Build · Design-Build Proposal

The Revelo-Garcia
Residence A Private Hillside Estate for a Family Legacy

A home built into the hillside. Engineered for the decades. Designed around the way your family truly lives.

ClientDr. Renamar Revelo-Garcia & Family
LocationMutual Executive Heights, Pagadian City
Lot Area560.87 sqm (TCT) · 556.12 sqm (survey)
Prepared ByJMG Design & Build
PrincipalEngr. Jasper M. Gementiza
DateJuly 2026

Discover · Design · Build  —  We Design. We Build. We Value People.

Listen to the Proposal — Audio Briefing

Prefer to listen? This recorded briefing walks through the strategy behind the Revelo-Garcia Residence — the hillside opportunity, the rooftop recommendation, energy resilience, and how JMG protects your investment. Press play, or continue reading below.

0:00–:–

Having trouble playing? Open the briefing on Google Drive.

Audio briefing available online: https://drive.google.com/file/d/1pJFl7W4hUqK7yThaCv45VSsfBYsNnUrQ/view

02 — Executive Letter

A Roadmap, Not a Quotation

Dear Dr. Revelo-Garcia and Mr. Garcia,

Thank you for the trust you have shown in sharing your plans with us — from your first message asking whether we accept projects in Pagadian, to the detailed room-by-room requirements you sent, to the priorities that surfaced in our conversations: the basement garage, the dual access, the dip pool, the solar-ready roof, the quarters for your driver and household staff, and a home organized enough that daily life stays calm.

This document is not a price quotation. It is a project roadmap.

A residence of this ambition — a two-storey home with a full basement, built into a site with a five-meter elevation change, carrying a solar-ready roof, backup power, a pool, and custom cabinetry throughout — succeeds or fails long before the first column is poured. It succeeds in the coordination: when the structural engineer, the architect, the electrical planner, the waterproofing specialist, and the cost planner are one team making one set of decisions, in the right order.

That is what JMG Design & Build offers you. Not drawings alone. Not construction alone. A single accountable team that designs what it will build, builds what it designed, and stands behind both.

We have studied your site survey, your requirements, and the character of your family’s brief. What follows is our honest assessment of the opportunities in your property, the risks that must be managed, the design strategy we recommend, and the disciplined process by which we would deliver it.

We look forward to building this with you — carefully, transparently, and properly the first time.

Engr. Jasper M. Gementiza Principal, JMG Design & Build · JMG Construction & General Merchandise

03 — Client Vision

What You Told Us

The Family Program

  • Five bedrooms — four en-suite; three for the children, one guest suite
  • Grand master suite — oversized walk-in closet, receiving area / mini office, his-and-her sinks
  • Open-concept living & dining with double-volume high ceilings
  • Clean kitchen with center island, large walk-in pantry, powder room
  • Dedicated gym
  • Dip pool (3–4 ft) with lawn and garden

The Working Estate

  • Five-car basement garage
  • Driver’s quarters and two helper rooms — dignified, well-ventilated, in the basement
  • Dual access — front subdivision road and rear frontage, two gated entries, through-circulation along one side if feasible
  • Dedicated storage corridor — built-in cabinets for documents, collections, and daily items

The Resilient Estate

  • Solar-ready roof — flat-roof vs. roof-deck question resolved by design
  • Detached generator room — vibration-isolated pad, serious acoustic treatment
  • Provisions for standing AC units in major public spaces
  • High perimeter walls on both sides for privacy and security
  • Preserved planting areas — the house must not consume the lot in concrete

The Three Design Drivers Beneath the Room List

A room list tells us what to build. Your conversations told us how you want to live. Three themes run through everything you described, and they govern every design decision we make:

1. Security Without Intimidation

The estate must be genuinely protected — high walls, controlled access, layered sightlines — yet never feel like a fortress from within or a provocation from without.

2. Freedom Without Enclosure

Dr. Revelo-Garcia values openness: high ceilings, garden views, light, air. Even with walls around the property, the interior experience must feel expansive, never boxed in.

3. Luxury That Reveals Itself Gradually

The home should not announce everything from the street. It should unfold — arrival, discovery, comfort, sanctuary — with its finest moments reserved for the family.

Stated Assumptions

  • The household includes the two of you and three children, plus a driver and up to two household helpers.
  • Bamboo is a meaningful design reference, to be interpreted in a refined tropical-contemporary manner — never rustic.
  • Extended power interruptions in Pagadian are a real planning concern, so energy resilience is a design priority, not an accessory.
  • Target floor area, final finish tier, and total investment envelope are to be confirmed during design development.

04 — Project Opportunity

Your Lot Is Not Flat — That Is Its Greatest Asset

Site ConditionDesign Implication
5.0 m elevation difference, front (lower) to rear (higher)The basement garage can be entered nearly at grade from the front road — dramatically reducing excavation, ramp length, and cost versus digging a basement into flat ground
North ≈ 18° from the front of the lotThe front façade receives softer northern light; the rear and sides must manage stronger sun — overhangs and screens go where the heat is
Dual road frontageTrue through-circulation: guest arrival at the front, service and staff movement at the rear, vehicles never reversing onto the main road
Rolling terrainA terraced, split-level plan that steps with the land — minimizing cut-and-fill, preserving soil stability, and giving the architecture its character
Elevated position in Mutual Executive HeightsPotential views and reliable exposure to Amihan and Habagat winds for cross-ventilation — view corridors subject to site verification

Opportunities You May Not Have Fully Priced In

  1. The hillside pays for part of your basement. On flat land, a 5-car basement means deep excavation, long ramps, and heavy waterproofing on all sides. On your site, the basement opens toward the low front — a walk-out level, not a buried one. Less excavation, natural light and ventilation into the garage and staff quarters, and a safer, drier basement.
  2. The rear access is a service artery, not just a second gate. Deliveries, waste collection, staff arrival, generator refueling, and construction logistics run from the rear — keeping the front arrival permanently clean and guest-ready.
  3. The roof is a working asset. Between solar generation, water-heating provisions, service zones, and a possible covered pavilion, the roof can earn its cost every year instead of sitting idle.
  4. The elevation change creates the arrival drama you want. Entering at the lower level and rising through the house toward garden and views is precisely the “luxury that reveals itself gradually” the family described.

Risks We Are Already Managing

The same terrain that creates opportunity creates obligations. We flag them now because early honesty is cheaper than late surprises:

  • Slope stability and retaining structures — subject to geotechnical investigation
  • Stormwater running downhill toward the house — the rear-uphill side must intercept and redirect water before it reaches the structure
  • Basement waterproofing at the cut face — the uphill retaining wall is the critical waterproofing zone
  • Seismic performance of a split-level structure — a solvable, well-understood engineering problem, but one solved on paper, not on site
  • Generator noise in an executive subdivision — acoustic design from day one

Every one of these appears again in the Risk Management section with its mitigation, responsible party, and decision timing.

05 — Design Strategy

A Terraced Estate That Emerges From the Hill

We do not propose to flatten your site and place a house on the platform. We propose a residence that steps with the terrain in three strata.

The Lower Stratum — The Working Base

Entered from the front road: the five-car garage, driver’s quarters, helper rooms, storage, mechanical and electrical rooms, and the service spine. This level does the estate’s work, quietly.

The Middle Stratum — The Living Heart

The double-volume living and dining space, kitchen and pantry, powder room, gym, and the seamless flow outward to the dip pool, lawn, and garden. Where the family gathers and guests are received.

The Upper Stratum — The Private Sanctuary

The master suite and children’s suites, the storage corridor as organizational spine, and the family’s quiet territory — with the roof above prepared as a productive fourth layer.

The Arrival Sequence

Guests arrive at the front gate on the subdivision main road. The gate opens not onto the whole house, but onto a landscaped forecourt — the home partially screened by planting and architectural elements. Vehicles descend gently into the basement garage or stop at a covered drop-off. Guests ascend — by stair or a future lift provision — and the double-volume living space opens before them with the garden and pool beyond. Discovery, then surprise, then comfort.

The family and staff, meanwhile, use the rear access: groceries straight to the pantry, staff to their quarters, deliveries to storage — none of it crossing the guest experience.

Public, Private, and Service Zoning

Diagrammatic only. Final zoning subject to site verification and design development.

Climate Strategy: The House Must Work Even When the Grid Does Not

  • Orientation and openings placed to capture Amihan and Habagat winds across the ground floor
  • Double-volume living space as a thermal chimney — high openings let hot air escape upward and out
  • Deep overhangs and shaded terraces on the sun-exposed faces
  • Bamboo-inspired vertical screens as functional shading, not decoration
  • Landscape cooling — planted areas, the pool, and permeable surfaces instead of heat-radiating pavement
  • High side walls designed with ventilation in mind, so security never suffocates airflow

Mechanical cooling — including the standing AC units you requested — then becomes a comfort layer on top of a house that is already livable, which matters enormously during extended power interruptions.

“The storage corridor becomes an organizational spine: visually quiet from the outside, highly functional within — keeping documents, collections, and daily necessities accessible without ever letting clutter reach the principal living spaces.”

06 — Space Planning Strategy

Level by Level

All areas and adjacencies below are planning intent, subject to survey validation, final programming, and your approval during design development.

Basement Level — The Working Base

SpacePurpose & Planning Logic
5-car garageEntered near-grade from the front road thanks to the site’s elevation. Column grid coordinated so five vehicles park and maneuver without gymnastics. Natural ventilation supplemented mechanically as required.
Driver’s quartersA proper room with natural light and ventilation where the walk-out condition allows — dignified accommodation, direct garage access, separated from the family stair.
Two helper roomsComfortable, ventilated, with their own toilet-and-bath and direct connection to the service stair up to the kitchen and laundry.
Mechanical & electrical roomsWater storage and pumps, electrical panels, inverter and battery provisions — consolidated, ventilated, serviceable without entering family areas.
Bulk storageSeasonal and heavy items near the garage; kept separate from the fine storage corridor upstairs.
Side passage / tunnel provisionThe requested front-to-back circulation along one side, studied as a covered service walk. Feasibility subject to setback verification, retaining design, and drainage analysis.

Ground Floor — The Living Heart

SpacePurpose & Planning Logic
Double-volume living & diningThe emotional center. High ceilings for air movement and grandeur; every principal seat has a view to garden or pool. Structural provision for standing AC units and ceiling fans.
Clean kitchen with center islandOpen to the dining space for family life, with the working mess concealed in the pantry behind.
Walk-in pantry / dirty kitchenLarge, ventilated, connected directly to the service stair and rear access — groceries never cross the living room.
Powder roomPositioned for guest convenience without exposing private circulation.
GymVentilated, with garden outlook where possible; floor structure designed for equipment loads.
Dip pool (3–4 ft) & gardenA resort moment scaled for the children, visible from the living space for supervision, with a shaded terrace mediating between indoors and water.
Guest suiteThe fifth bedroom at ground level — convenient for guests and a quiet aging-in-place provision. Placement to be confirmed with you.

Second Floor — The Private Sanctuary

SpacePurpose & Planning Logic
Master suiteWalk-in closet sized as a true dressing room; receiving area / mini office at the suite’s threshold so work never requires crossing the bedroom; bathroom with his-and-her sinks; the best orientation for morning light and breeze.
Three children’s suitesEach en-suite, acoustically separated, sized to grow from childhood to adolescence to visits home from university.
Family hall / landingThe soft space that keeps the second floor from being a corridor of closed doors.
Storage corridorThe cabinet-lined organizational spine — detailed in Section 11.

Roof Level & Outdoors

Solar arrays, service zones, drainage, and the optional covered pavilion are evaluated as three distinct options in Section 7. Outdoors: a front forecourt with screening landscape and covered drop-off; a rear service court with generator enclosure, refuse, and secondary gate; side gardens softening the high perimeter walls; and perimeter walls designed with layered planting and architectural texture so security reads as elegance, not hostility.

07 — Rooftop & Pavilion Strategy

Roofing or Roof Deck? A Decision, Not a Default

Your synopsis raised the right question: flat roof — roofing only, or roof deck? This decision has real structural and cost consequences, and it should be made deliberately. We present three configurations.

Option A — Solar & Service Roof

The roof works, but people rarely go there. Solar arrays occupy the best-oriented zones; the rest is maintenance access, drainage, and concealed utilities.

  • Structure: lightest — panels, maintenance traffic, equipment only
  • Waterproofing: standard membrane; simplest to detail and warrant
  • Cost: lowest of the three
  • Value: full energy benefit, minimal lifestyle benefit
Recommended

Option B — Hybrid Solar Roof + Covered Pavilion

Disciplined zones: a solar field, a service and drainage zone, and one covered open-air pavilion — a shaded family lounge for evening breezes, quiet coffee, and the views your elevated site may offer.

  • Structure: occupied-deck loading only where the pavilion sits
  • Waterproofing: trafficable membrane under the pavilion zone only; the canopy gives the deck a second rain layer
  • Cost: moderate — the premium confined to one zone
  • Bonus: the canopy can itself carry panels — a solar canopy that shades people while generating power

Option C — Premium Multifunctional Roof Deck

The full roof becomes an entertainment level — solar canopy, lounge, viewing deck, planters, lighting, event capacity.

  • Structure: heaviest — full occupied live loads across the slab
  • Waterproofing: trafficable, root-resistant systems throughout; the most to maintain
  • Cost: highest — everything scales up
  • Caution: much of its function duplicates the garden and pool level you already have

Our recommendation: Option B — full solar value, one beautiful covered outdoor room in the sky, and the premium confined to a single zone. Critically, the structure can be designed today so that Option C remains possible tomorrow. Deciding the loading now costs a modest allowance in the structural design. Deciding it after construction costs demolition. All rooftop options subject to structural analysis and wind-load calculation per the National Structural Code of the Philippines.

The Pavilion Question — Roof or Garden?

A covered open-air pavilion could alternatively live beside the pool as a garden pavilion / outdoor sala — an extension of the living space for dining and gatherings, shaded, rain-protected, and immediately accessible to the kitchen. During design development we will study both positions and may recommend a modest version of each: the garden pavilion as the daily workhorse, the roof pavilion as the private retreat. The correct terminology, form, and budget follow from that study — we will not install a token gazebo and call it strategy.

08 — Material & Bamboo Strategy

Identity, Not Ornament

Bamboo matters to your family. Our responsibility is to honor that identity while protecting you from the maintenance burden that raw bamboo can impose in Pagadian’s sun, rain, and termite environment. We propose a three-tier hierarchy.

Primary — One Signature Gesture

A single, unmistakable architectural statement — for example, a full-height vertical screen at the arrival façade or the pavilion, in bamboo rhythm and proportion. This is what guests remember.

Secondary — The Living Layers

Ceiling patterns in the double-volume space, pavilion soffit detailing, privacy screens at terraces, and selected cabinetry fronts — warm, repeated, consistent.

Subtle — The Quiet Thread

Landscape planting of clumping (non-invasive) bamboo along the perimeter walls and courtyard, textural references in tile and stone, and the color palette itself.

Material Honesty: Where Real Bamboo Works, and Where It Doesn’t

MaterialBest ApplicationsWatch-outs
Treated natural bambooInterior ceilings, sheltered soffits, furnitureRequires proper treatment against termites and moisture; periodic re-finishing; supply quality must be verified
Engineered bamboo panelsInterior feature walls, cabinetry, ceiling planesExcellent stability indoors; not for exposed exterior use
Bamboo-look aluminumExterior screens, gates, exposed vertical finsZero termite/UV risk, minimal maintenance, crisp luxury finish — our default for exposed exterior “bamboo”
Bamboo-look fiber cement / WPCExterior cladding accents, wet-adjacent areasDurable and economical; texture quality varies by supplier — mockup before commitment
Live bamboo (clumping species)Landscape, courtyards, wall softeningChoose non-running species; allow root and drip management
“Authentic bamboo where the hand touches and the eye lingers; engineered bamboo character where sun, rain, and termites govern.”

The estate reads as bamboo-inspired tropical luxury everywhere — and asks for real bamboo maintenance almost nowhere. Final selections subject to supplier sampling, mockup approval, and your review of actual materials — never catalog photos alone.

09 — Engineering Strategy

An Engineering-Led Project, Stated With Discipline

A split-level structure with a basement cut into a slope, carrying rooftop loads, in a seismic and typhoon-exposed country. Here is how we approach it — clear about what is known and what must be validated.

Structure & Foundations

  • Reinforced concrete moment frame anticipated, stepped with the terrain to minimize cut-and-fill — final system subject to structural analysis
  • Foundation typesubject to geotechnical investigation, scheduled as one of the first project activities
  • Basement retaining walls at the uphill cut, designed for earth pressure, surcharge, and water pressure — with drainage designed so the wall never fights standing water
  • Seismic design per the National Structural Code of the Philippines; split-level stiffness irregularity is a known problem with known solutions — resolved in analysis, not improvisation
  • Wind design for roof structures, pavilion, and solar arrays — uplift is a governing load case, subject to final wind-load calculation

Water: The Discipline That Decides Whether a Hillside House Succeeds

  • Uphill interception — a drainage line at the rear boundary catches slope runoff before it reaches the building
  • Basement waterproofing — membrane plus drainage composite at retained faces, waterstops at construction joints, perimeter subdrain to a sump with pump redundancy
  • Roof drainage — primary drains plus independent overflow scuppers; a flat roof with a single drainage path is a leak with a schedule
  • Flood testing of every roof and wet area before finishes proceed — documented, witnessed, non-negotiable

Electrical, Mechanical & Plumbing

  • Electrical planning zoned from day one into critical, essential, and convenience loads (Section 10)
  • Generator provisions: detached enclosure, vibration-isolated pad, acoustic lining, exhaust routed away from bedrooms and neighbors, refueling access from the rear service court
  • Inverter and battery room in the basement: ventilated, protected, expandable
  • Water resilience: dedicated storage tank, booster pumps, rainwater-harvesting provision for irrigation — capacities subject to final fixture count and load study
  • Standing AC provisions: dedicated circuits, condensate routing, concealed outdoor-unit zones planned now, not chased into walls later

Items Requiring Validation Before Final Engineering

ItemMethodTiming
Soil bearing capacity & slope stabilityGeotechnical investigation (boreholes)Immediately after engagement
Exact boundaries, contours, utilitiesRelocation & topographic survey verificationImmediately after engagement
Electrical service capacityUtility coordination & load studyDesign development
Local code & subdivision requirementsLGU and HOA verificationBefore design finalization
Stormwater discharge pointDrainage assessmentDesign development

We state plainly: no responsible engineer finalizes a hillside basement design before the geotechnical report exists. Firms that skip this step are not saving you money; they are borrowing it from your future repairs.

10 — Energy Resilience Strategy

Layers, Not Rivals

“A luxury home should not only be beautiful under ideal conditions; it should continue to protect, comfort, and support its family under challenging conditions.”

Power interruption in Pagadian is not a hypothetical. Solar, batteries, and the generator are not competing purchases — they are complementary layers:

Solar ArrayDaytime generation, lower monthly bills
Battery BankSilent bridge for critical loads — lights, refrigeration, internet, security, pumps
GeneratorSustained backup for prolonged outages and heavy loads — selected AC, full house
Automatic Transfer + Essential-Load PanelDecides which layer feeds which circuits, seamlessly

Three Levels of Commitment

Level 1 — Provision-ReadyLevel 2 — Partial ResilienceLevel 3 — Integrated Resilience
SolarRoof engineered for panels; conduits, inverter space, penetrations built inInitial solar array installedFull array, expandable
BatteryVentilated battery room reservedBattery for critical circuitsLarger bank, automatic load management
GeneratorPad, enclosure, conduit, exhaust route builtGenerator installed, manual/auto transferGenerator + ATS, fully automatic
During an outageGenerator-dependent (once installed)Critical loads ride through silently; generator for extended eventsHouse barely notices; management is automatic
Relative costLowest now — protects the future for a small premiumModerateHighest — maximum comfort and independence

Our recommendation: build all Level-3 infrastructure into the structure now — conduits, rooms, pads, roof engineering, essential-load panel, transfer provisions — because embedding these during construction costs a fraction of retrofitting them. Then install equipment at the level your budget dictates, knowing every upgrade path is already paved. Equipment capacities are subject to the electrical load study and supplier quotation — we will not invent kilowatt figures to sound impressive.

Safety provisions carried at every level: surge protection, grounding and lightning protection, battery-room ventilation and fire-safety detailing, generator exhaust and noise control, and clear maintenance access to every piece of equipment.

11 — Storage & Organization Strategy

The Organizational Spine

You asked for something most clients never think to request: a dedicated corridor of built-in storage. We treat this as a serious piece of architecture. Our recommended position is the second-floor circulation connecting the family hall to the bedroom wing — the route the family walks daily — with a secondary utility-storage run at the service stair. Final placement to be studied against the floor plan and confirmed with you.

Design Standards

ElementStandard
Corridor clear widthGenerous enough that open cabinet doors never trap a person — cabinetry must not steal circulation
CabinetryFull-height, flush, handle-minimal doors reading as a paneled wall — visually silent
Depth strategyMixed: shallow runs for documents and display, deep runs for linens and bulk
LightingIntegrated strip lighting at display niches; motion-activated general lighting
Ventilation & humidityVentilation slots or discreet mechanical extract; dehumidification provision at document/collection zones
MaterialsMoisture-resistant carcasses; termite-resistant detailing; no raw MDF in humid zones
SecurityLockable sections for valuables and sensitive documents

Internal Zoning of the Spine

Everyday

  • Daily-use items the household reaches for weekly
  • Utility cabinet — chargers, tools, spare consumables, integrated charging points

Protected

  • Documents & records — dry, lockable, organized
  • Locked personal storage per family member
  • Collections & display — glazed niches, controlled lighting, dust protection

Household

  • Linen & household supplies — deep, ventilated
  • Seasonal storage — decorations, occasional items

A home stays calm when everything has a place — and the place is beautiful, reachable, and closed. The corridor absorbs the entropy of family life so the living spaces never have to. It is one of the least glamorous line items in this proposal and one of the most life-changing.

12 — Construction Strategy

Design Ambition Means Nothing Without Construction Discipline

This project’s specific execution risks — basement waterproofing, rooftop membranes, solar coordination, custom cabinetry, acoustic generator work — are exactly the failures that occur when the designer and builder are different companies pointing at each other. Here is how JMG runs the build:

Coordination Before Concrete

  • Shop drawings for cabinetry, screens, the pavilion, railings, and waterproofing — approved before fabrication
  • Mockups for the bamboo screen system and key finishes — you approve the real thing, not a rendering
  • Material approvals documented; no substitution without your written sign-off
  • Solar, generator, and electrical contractors coordinated during design, so conduits and pads exist where equipment actually lands

Quality Assurance on Site

  • Full-time supervision with a defined QA/QC inspection plan
  • Structural inspections at every critical stage — rebar before pour, every pour documented
  • Waterproofing flood tests, witnessed and recorded, before any finish covers the membrane
  • Electrical testing — insulation, grounding, load verification — before energization
  • Safety program protecting workers, neighbors, and your property

Communication You Can Rely On

  • Scheduled progress reports with photographs
  • A single point of contact — no chasing subcontractors
  • Transparent variation-order process: no change without documented scope, cost, and your approval
  • Systematic punch-listing and formal turnover with as-builts, warranties, and manuals

The quiet result: fewer surprises, fewer change orders, and no finger-pointing — because on a JMG project there is only one party responsible, and it is us.

13 — Why JMG

Why Design-Build Matters for This Particular House

We will not recite adjectives. Here is why the design-build model — and this firm specifically — matters for your project:

  1. Because your basement lives or dies on coordination. The retaining wall, membrane, subdrain, sump, and garage slab are designed by an engineer and executed by a builder. When those are two companies, the warranty gap between them is exactly where water enters. At JMG, the engineer who detailed the wall answers for the wall that gets built. One point of accountability. No finger-pointing.
  2. Because a solar-ready roof is a promise most builders break by accident. “Solar-ready” fails when the conduit wasn’t run, the penetration wasn’t flashed, or the structure wasn’t sized for uplift. We design the roof, structure, and electrical rough-in as one system — so panels land on a roof that was genuinely waiting for them.
  3. Because custom cabinetry across an entire storage spine demands shop-drawing discipline — dimensions verified on site, moisture-appropriate materials, and a builder who checks the fabricator’s work against the architect’s intent. We are both, so nothing is lost in translation.
  4. Because a generator in an executive subdivision is a neighbor-relations project as much as an electrical one. Acoustic enclosure, vibration isolation, and exhaust routing are designed once, correctly, by the same team pouring the pad.
  5. Because founded and led by a licensed civil engineer, JMG is engineering-first by DNA — with more than one hundred completed projects behind our processes. Our proposals are written by the people who will stand on your site.
  6. Because we build in Mindanao, for Mindanao conditions — the rains, the heat, the seismic reality, the supply chains, and the LGU processes of this region are our daily working environment, not a footnote.

And candidly: we are not the least expensive builder you will meet, by design. Clients engage JMG because they want the work done properly the first time — with fewer mistakes, less stress, and a house that performs for decades. That is the value we are structured to deliver.

The People Leading Your Project

Single-point accountability is only as strong as the people who carry it. Your project is led directly by the principals — not delegated past them.

Portrait of Engr. Jasper M. Gementiza

Engr. Jasper M. Gementiza

Principal · Civil Engineer · Project Director

Licensed civil engineer and founder of JMG Design & Build. Directs the engineering, cost planning, and construction execution of the estate — and answers personally for both.

Portrait of Ar. Robinson Chua

Ar. Robinson Chua

Project Architect

Author of the project synopsis and lead of the architectural concept — translating the site’s terrain and the family’s brief into the terraced estate design.

14 — Value Engineering

Protecting Intent, Removing Waste

Value engineering, done honestly, protects design intent while removing cost that adds nothing to your life. It is not cheapening. Three illustrative decision sets:

Decision Set 1 — Rooftop Scope

A · Solar/Service RoofB · Hybrid + Pavilion ★C · Full Roof Deck
Relative costLowestModerateHighest
Lifestyle valueMinimalOne excellent covered spaceMaximum, partly duplicative
Structural demandLightZonedHeavy throughout
Future flexibilityUpgrade requires structural checkDesigned for future upgradeAlready maximal

Recommendation: B, with structure pre-engineered for a future C.

Decision Set 2 — Energy Equipment Timing

A · Provision-ReadyB · Partial Now ★C · Full Level 3 Now
Relative cost nowLowestModerateHighest
Outage experienceGenerator only (when installed)Critical loads protected silentlyNear-seamless
Retrofit riskNone — infrastructure embeddedNoneNone

Recommendation: embed all infrastructure now (non-negotiable); install equipment at Level 2, expand later.

Decision Set 3 — Exterior Bamboo Expression

A · Treated natural bambooB · Bamboo-look aluminum ★C · Bamboo-look WPC / fiber cement
AuthenticityHighestHigh visual fidelityModerate–high
MaintenanceRecurring treatment & replacementMinimalLow–moderate
Termite / UV riskRealNoneLow
Relative lifetime costHighest despite lower entryModerateLowest

Recommendation: B for exposed exterior; genuine bamboo indoors where it is protected and touchable.

Further studies during design development: pool size and finish tier, basement finish levels, smart-home scope (wire now, device later), landscape phasing, and cabinet finish hierarchy (premium at eye level, economical inside carcasses).

15 — Project Phasing

The JMG Roadmap: Discover → Design → Build

PhaseStageKey Outputs
Discover1. Discovery & programmingConfirmed room list, lifestyle brief, priorities
2. Site validationSurvey verification, geotechnical investigation, utility & LGU/HOA checks
Design3. Concept designTerraced massing, zoning, rooftop option selection
4. Design developmentPlans, elevations, material palette, pavilion & storage-corridor design
5. EngineeringStructural, electrical, plumbing, mechanical design
6. Cost planning & value engineeringDetailed estimate, option decisions
7. Client approvalSigned-off design and budget
8. PermitsBuilding permit and clearances
Build9. Procurement planningLong-lead orders, supplier lock-ins
10. ConstructionStructure → envelope → MEP → finishes
11. Testing & commissioningFlood tests, electrical tests, systems commissioning
12. Inspection & punch listSystematic completion
13. TurnoverAs-builts, warranties, manuals, orientation
14. Warranty & supportDefects liability period and after-sales service

Decisions That Must Be Made Early — and Why

DecisionDeadlineCost of Deciding Late
Rooftop option (A/B/C)Before structural designRoof slab demolition or permanent limitation
Solar / battery / generator levelBefore electrical designChasing conduits through finished walls
Storage corridor locationConcept designCorridor becomes leftover space, not a spine
Pavilion position (roof / garden / both)Concept designFoundations and structure misplaced
Bamboo material tierDesign developmentProcurement delays; compressed mockup cycle
Pool size and depthBefore ground-floor structural designExcavation and waterproofing rework

16 — Financial Framework

Honest Structure, Not Invented Precision

As shared in our early conversation, design-build for a premium-range custom residence currently starts around ₱41,000–₱50,000 per sqm of floor area and rises with design complexity, structural conditions (a hillside basement is a complexity), and finish tier. The governing number is floor area, not lot area — and floor area is exactly what the concept design phase establishes. A meaningful cost conversation follows the concept, not the other way around.

Cost Categories

CategoryTreatment
Design & engineering feesDefined at engagement; credited structure discussed at proposal signing
Base construction scopeFixed against approved drawings and specifications
Provisional sumsFor items awaiting specialist quotation (solar equipment, generator set, pool systems) — transparent placeholders, reconciled against actual quotes
AllowancesFor selections not yet made (final tile, sanitary ware tier) — spend more or less; the difference is yours either way
Optional enhancementsRoof deck upgrade, battery expansion, smart-home devices — priced separately, never buried
ContingencyA disclosed reserve for genuine unknowns (primarily below-ground conditions) — held transparently, unspent balance reported
ExclusionsStated in writing (loose furniture, land costs, utility company fees) — no ambush line items

Payment Structure & Transparency

Progress-based payments tied to verified milestones — mobilization, structural stages, envelope, finishes, completion — so payment always follows demonstrated work. Every cost is labeled: included in base scope / optional / provision now–install later / subject to engineering / subject to supplier quotation / subject to final area and specifications. No hidden costs; no misleading certainty. Budget monitoring reports run throughout construction, so you always know position versus plan.

All figures subject to final floor area, approved specifications, geotechnical findings, and prevailing market conditions at contract date.

17 — Investment Protection

Built Into the Process, Not Promised at the End

During Design

  • Design accountability — the firm that drew it must build it; no gap for errors to hide in
  • Mockups and material approvals — you approve reality before it multiplies across the house
  • Solar-system coordination — roof, structure, and electrical certified ready, protecting future equipment

During Construction

  • Documented inspections — rebar, waterproofing, electrical: photographed, logged, witnessed
  • Waterproofing accountability — flood tests before finishes; the highest-risk trade gets the strictest gate
  • Variation-order discipline — no change without written cost and approval; your budget cannot drift silently
  • Cabinetry quality control — shop drawings, site verification, factory checks before delivery

After Turnover

  • Warranty and defects liability — defined periods, documented, with a firm that will still be here to honor them
  • Complete documentation — as-builts, manuals, maintenance schedules, warranties in one handover, protecting resale value
  • After-sales support — maintenance guidance for the membrane, solar, generator, pool, and cabinetry, so the estate ages the way it was engineered to

18 — Project Timeline

Honest Scheduling Beats Impressive Scheduling

Durations below are typical planning ranges for a residence of this scope, to be firmed after the concept and permits define the real critical path.

MilestoneIndicative DurationCritical Dependencies
Discovery, survey & geotechnical3–6 weeksSite access; laboratory turnaround
Concept design & client approval4–8 weeksYour decision cadence on rooftop, pavilion, storage spine
Design development & engineering8–12 weeksGeotechnical report; option lock-ins
PermitsVariable by LGUComplete documents; HOA endorsement
Procurement (long-lead)Overlaps design / permitsSolar equipment, generator set, specialty screens, cabinet hardware
ConstructionTo be established from final scopeWeather windows for excavation and waterproofing; timely selections
Commissioning & turnover3–5 weeksSystems testing; punch-list closure

Scheduling realities we plan around: excavation and basement waterproofing sequenced against the rainy season; cabinet shop drawings released early because fine cabinetry is a long-lead trade; solar and generator equipment ordered against confirmed electrical design; bamboo-system mockups approved before bulk procurement; and clearly flagged client-decision deadlines — because the most common cause of residential delay is not weather, it is late selections. We will protect you from that by telling you, well in advance, exactly what must be decided when.

No completion date will be promised before scope, permits, and procurement are defined. Dates promised earlier than that are marketing, not management.

19 — Risk Management

Named, Assigned, Scheduled

A professional builder does not hide risks; a professional builder names them, assigns them, and schedules their resolution.

#RiskLikelihoodImpactMitigationResponsibleDecision Timing
1Adverse soil / slope conditionsModerate (hillside)HighGeotechnical investigation before design finalization; retaining design to findingsJMG EngineeringPhase 2
2Basement water ingressModerateHighUphill interception drain; membrane + subdrain + sump redundancy; flood testingJMGDesign & construction gates
3Rooftop membrane failureLow–moderateHighTrafficable membrane at occupied zones; overflow drainage; witnessed flood tests; maintenance planJMGDesign + pre-finish gate
4Solar structural loading / upliftLowModerateWind-load design to NSCP; panel layout coordinated with structureJMG EngineeringBefore roof design
5Generator noise & exhaust complaintsModerateModerateAcoustic enclosure, vibration pad, exhaust routing, commissioning sound checkJMG + supplierDesign development
6Battery ventilation / fire safetyLowHighDedicated ventilated room; code-compliant detailing; quality equipment onlyJMG + supplierDesign development
7Bamboo deterioration / termitesModerate if natural bamboo outdoorsModerateMaterial hierarchy per Section 8; treated stock; engineered alternatives at exposureJMG + client selectionDesign development
8Cabinet moisture / collection preservationLow–moderateModerateMoisture-resistant carcasses; ventilation; dehumidification at document zonesJMGShop-drawing stage
9Stormwater / flood exposure at lower levelModerateHighSite drainage design; discharge verification; pump redundancyJMG EngineeringDesign development
10Permitting delaysModerateModerateEarly LGU/HOA engagement; complete first submissionsJMG + client documentsPhase 2 onward
11Supply-chain delays on long-lead itemsModerateModerateEarly procurement plan; approved alternates on fileJMGProcurement phase
12Cost escalation before contractModerateModerateTimely design decisions; early supplier lock-ins; disclosed contingencySharedContinuous
13Delayed client selectionsCommon industry-wideModerate–HighDecision calendar issued at design start; advance remindersClient, supported by JMGPer calendar
14Unauthorized material substitutionLow under design-buildHighWritten approval protocol; site verification against specificationsJMGContinuous

The pattern to notice: nearly every high-impact risk on this list is resolved by decisions made early and documents enforced on site — which is precisely the discipline the design-build model exists to provide.

20 — Why Act Now

Not Urgency for Its Own Sake — Sequencing Logic

  1. The geotechnical investigation gates everything. Until the soil report exists, the basement, retaining walls, and foundations remain assumptions. Starting discovery now means design proceeds on facts.
  2. The rooftop decision is structural, and structure comes first. Choosing between Options A, B, and C after the roof slab is designed means either redesign or a roof that can never become what you wanted.
  3. Energy infrastructure is nearly free to embed and expensive to retrofit. Conduits, pads, rooms, and roof penetrations cost little during construction and a small demolition project afterward.
  4. Long-lead items dictate the calendar. Solar equipment, the generator set, and fine cabinetry are ordered months before they are needed. The earlier design locks, the earlier procurement protects your schedule.
  5. Weather windows matter on a hillside. Excavation, retaining works, and waterproofing want dry-season execution; starting design now positions construction to catch the right window rather than fight the wrong one.
  6. Construction costs trend upward. We will not dramatize this — but a design finalized sooner is priced sooner, and locked supplier commitments hold better than intentions.

Every month of early, well-ordered design work is purchased back several times over in avoided rework, avoided retrofit, and avoided waiting.

21 — Recommended Next Steps

Clear Outputs, Clear Decisions, Clear Owners

  1. Confirm the engagement framework — design-build delivery under JMG, with the fee structure formalized.
  2. Schedule site validation — relocation/topographic survey verification and geotechnical investigation.
  3. Hold the architectural programming session — finalize the room list, storage-corridor contents, and staff-quarters requirements with the whole family heard.
  4. Select the rooftop concept — Option A, B, or C (our recommendation: B, structured for future C).
  5. Set the energy-resilience level — infrastructure fully embedded; equipment at Level 1, 2, or 3.
  6. Define the bamboo expression tier — and approve the mockup pathway.
  7. Confirm pavilion strategy — roof, garden, or both.
  8. Receive the preliminary space plan — the first drawings of your terraced estate.
  9. Review the concept design presentation — massing, zoning, arrival sequence, and material direction.
  10. Receive the initial cost framework — built on the actual concept floor area, with every category labeled per Section 16.

That is how this project will feel from the first meeting to the day we hand you the keys.

22 — Closing Message

Dr. Revelo-Garcia, Mr. Garcia —

The house you described is not extravagant. It is considered. Five bedrooms because the family is growing. A basement garage because the site offers one gracefully. A storage spine because calm is a form of luxury. Solar and a generator because you refuse to let the grid decide when your children have light. A pool scaled for small swimmers. Quarters that treat the people who help your household with dignity. Bamboo, because identity matters.

Our work is to take all of that — the hillside, the requirements, the things you said in passing that revealed how you actually live — and return it to you as a home that is engineered honestly, built carefully, and organized around your family for the next forty years.

This proposal is our thinking, offered openly. The next step is a conversation: walk the site with us, challenge our assumptions, tell us what we missed. The best homes we have built began exactly that way.

This is not only a house to be built. It is a family environment to be understood, engineered, protected, and brought to life.

We Design. We Build. We Value People.

JMG Design & Build · JMG CONSTRUCTION & GENERAL MERCHANDISE
Engr. Jasper M. Gementiza, Principal · Cagayan de Oro City · Serving Mindanao

This proposal is a strategic planning document. All areas, systems, capacities, durations, and costs are indicative and subject to: site verification, topographic and geotechnical investigation, structural analysis, electrical load study, drainage assessment, local code and HOA verification, supplier and specialist quotation, final approved floor area and specifications, and client approval at each design stage.